Shift calendars, hours and overtime pay

4 On 4 Off Schedule Calendar

Pick the 4 on 4 off version and your crew to see every work day by date and the hours and overtime each week gives.

Free · runs in your browser · nothing is uploaded

Open on Shiftfigure

This embed was switched off for this website. Open on Shiftfigure

Add this tool to your siteFree embed code, no sign-up. Keep the credit link.

Embed this tool

Copy this code into your website, blog or class page. The tool runs inside your page.

Optional settings, added to the address after embed=1: &accent=0f6b5c (colour, 3 or 6 hex digits). Other parameters are ignored.

Please keep the credit link below the tool.

The 4 on 4 off schedule calendar builds a shift calendar for a crew that works four days, has four days off, and repeats every eight days. It runs in your browser for free. You pick the cycle start date, and the page shows the chosen crew’s month as a calendar with paid hours and estimated pay under the overtime rule you select. The four crews run the same cycle, each delayed by a fixed number of days, so you can see who is on which shift on any date. You can also mark sick days, vacation, pickups and swaps without changing the rotation. When the calendar is set, export your shifts as a calendar file or CSV, or print the month. The tool covers the standard day and night version and a 2 days, 2 nights version.
4 on 4 off schedule example

How to use the 4 on 4 off schedule calendar

  1. Open Schedule and choose the 4 on 4 off pattern you want: days and nights, or 2 days and 2 nights.
  2. Set Crew A starts the cycle on to the first day of crew A’s rotation. The other crews follow automatically.
  3. Check Shift times and breaks. The defaults are day 07:00-19:00, night 19:00-07:00, and no unpaid break. Change them if your shifts differ.
  4. Enter your Hourly rate.
  5. Under What sets your overtime?, pick the rule pack that matches your employer or agreement.
  6. Use Crew to switch between crews A, B, C and D, and read the calendar for the crew you pick.
  7. Set First month and Months to show to choose the range the result card totals.
  8. Use Find my crew to see which crew works a chosen shift on a chosen date.
  9. Tap a day to record what really happened: on a work day, the mark cycles through sick, vacation, off and swapped shift; on a day off, it marks a picked-up shift. The rotation itself stays the same.
  10. Use Download calendar (.ics), Download CSV or Print to save or share the result.

Marks are stored only in your browser, so download your calendar before you clear the marks or switch devices. Use Clear my marks to remove them. Public holidays are underlined in the calendar.

How many hours is 4 on 4 off?

A crew on a 4 on 4 off schedule works 4 of every 8 days and averages 42 paid hours per week, with a Monday to Sunday range of 36 to 48 hours. Over a year that comes to about 2190 hours and 182.5 shifts per crew, using the default 12-hour day and night shifts.

Measure4 on 4 off (days and nights)
Cycle length8 days
Work days per cycle4
Longest run on / off4 days / 4 days
Average paid hours per week42
Hours in a Monday-Sunday week36 to 48
Shifts per year182.5
Paid hours per yearabout 2190
Weekends fully off38%
24/7 coverage, one crew per hourYes, with default times

The 2 days, 2 nights version shows the same numbers. Hours change only if you edit the shift times.

Do you get overtime on 4-on-4-off?

Overtime depends on the rule pack you select, not on the pattern alone. In the worked example, four weeks of crew A at $30 an hour produced 32 overtime hours under the FLSA 40-hour workweek, but none under the FLSA 7(k) fire rule. Contracts and union agreements can differ from these estimates.

Rule pack (worked example)Overtime hoursEstimated gross pay
US federal 40-hour workweek (FLSA)32 h at 1.5x$6240.00
FLSA 7(k) fire (212 h in 28 days)None$5760.00

The tool counts overtime over whole workweeks, so a week cut by the edge of the months shown is counted in full.

More questions

How does a 4 shift system work?

Four crews share the coverage, and each crew works four of every eight days. “Crew A starts the cycle on” sets the start of crew A’s cycle, and the other crews run the same cycle delayed by a fixed number of days.

What Is the Panama Shift Pattern?

Panama is a 2-2-3 rotation of 12-hour shifts in which crews swap between days and nights every two weeks. This page covers 4 on 4 off; the Panama Schedule Calendar shows that rotation by date.

How do I export my shift calendar?

Use Download calendar (.ics) to get one event per worked shift for Google, Apple or Outlook calendars. Download CSV gives shifts with paid, regular and overtime hours and pay, and Print prints the calendar without the form.

How this tool works and where the numbers come from

The calendar repeats the rotation from your crew’s start date and counts every shift minute by minute. Overtime and pay are worked out over whole workweeks (or the 7(k) and 7(j) work periods) under the rule pack you pick, following the official texts below. Results are estimates, not legal or payroll advice.

Sources

Reviewed · Published by Shiftfigure

Frequently asked questions

What is a 4 on 4 off schedule?

A crew works four days in a row, then has four days off, and the cycle repeats every eight days. With four crews and the default times, every hour is covered by exactly one crew.

What is a 4 on 4 off shift pattern?

It is the same repeating run of four work days and four days off. The day and night version uses 12-hour shifts, while the 2 days, 2 nights version works two day shifts and then two night shifts in each run.

Is a 4 on 4 Off Good?

It suits people who want long stretches off and a predictable calendar. The tradeoff is long runs of work and an average of 42 paid hours a week, so compare those numbers with your own needs.

What Is a 4-on-3-off Shift Pattern?

It is a 7-day cycle of four work days followed by three days off. This page covers the 4 on 4 off patterns; the Shift Calendar Maker accepts it as a custom pattern written D4 O3.

How many working days are in a 4 on 4 off shift pattern?

A crew works four of every eight days, which comes to 182.5 shifts a year. That is roughly half of the calendar.

How many weekends?

A crew on this pattern has a fully off weekend 38% of the time. In the other weekends, at least one day is a shift, so you will work part of most weekends. The calendar shows the exact weekends for your crew.

Is 4-on-4-off better than 5-8?

Neither suits everyone. 4 on 4 off gives 4 days off after every 4 days worked and 182.5 shifts a year per crew, but its 12-hour shifts are long. Compare that shift count and daily length with a 5-8 schedule before you decide.

What Is a 7-on-7-off Schedule?

It is a 14-day cycle with seven straight work days followed by seven days off. The 7 On 7 Off Schedule Calendar shows it by date with its 84-hour work weeks.